News
Arrangement of a temporary bridge is completed in Chuberi
11 July, 2018 11:17:04
It is a seventh day as disaster liquidation works are ongoing in Chuberi in continuous mode. Arrangement of a panel bridge construction connecting to the left bank of the river should have lasted 4-5 days, but due to works conducted in 24-hour mode, installation of th...
Roads Department is involved in disaster liquidation measures in Chuberi
05 July, 2018 20:07:43
In order to plan and carry out disaster liquidation measures, bank protection and road rehabilitation specialists of Roads Department of Georgia are in the village of Chuberi, Svaneti. In addition, representatives of Adjara and Kut...
Road repair works are completed on Tbilisi-Senaki-Leselidze highway
03 July, 2018 15:05:16
Within maintenance of Tbilisi-Senaki-Leselidze international road, restoration works of road pavement are in the completion stage. For the tourist season, a road damaged during the winter period was fully repaired. Asphal...
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: