News
The installation of metal coils on the 4th bridge of the Shorapani-Argveta section has been completed
24 March, 2023 11:27:57
On the fourth, Shorapani-Argveta section of the high-speed Rikoti road, on the N4 bridge (Argveta-Tbilisi direction) within the framework of the project, the installation of metal coils has been completed. The maximum carrying capacity is 400 tons. On the Shorapani-Argveta section, a total of 14....
Research into the causes of damage to the road bridge under construction over the Rioni River is underway
20 March, 2023 10:11:27
At the request of the Roads Department of the Ministry of Regional Development and Infrastructure of Georgia, initial research works are already underway to determine the causes of damage to the road bridge under construction that is part of the Samtredia-Grigoleti main road. A road bridg...
Road cleaning works are underway near the village of Vertkvichala
19 March, 2023 11:33:07
On the 161st km section of the Tbilisi-Senaki-Leselidze international road (near the village of Vertkvichala), a mass of land came down from the mountainside, causing the road to be blocked. At this time, cleaning works are actively underway, and the traffic has been diverted to the direc...
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: