News
Works on the Damaged Sections caused by the Overflowing of river Nenskra will be started Immediately after Lowering of Water Level
07 June, 2019 16:36:40
In Chuberi village of Mestia Municipality, the overflowing of existing river Devra (the tributary of Nenskra),caused by the abundant precipitation, resulted in the overflowing of the river Nenskra. By this time, the population of C...
Works Started at flooded section of km 56 of Pshaveli-Abano-Omalo Road
07 June, 2019 16:06:33
The water level lowering and road restoration works have been started at the km 56 of Pshaveli-Abano-Omalo road caused by the landslide resulted in formation of the lake. By this time, five units of heavy equipment including one excavator, one crawler excavator and th...
GTU Students Familiarized with Zemo Osiauri-Chumateleti Construction Process
07 June, 2019 10:36:41
Deputy Chairman of Roads Department of Georgia, Giorgi Tsibadze, together with the representatives of the Department and students of Civil Engineering faculty of Georgian Technical University made a site visit at East-West highway road, Zemo Osiauri-Chumateleti sec...
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: