Samterdia-GrigoleTi
Samtredia-Grigoleti Road - Lot I

 

Length of the section to be constructed – 11.5 km

Donor - European Investment Bank (EIB) and State Budget GOG

Upgrading of 57 km Samtredia-Grigoleti road will be implemented in 4 lots. Tender procedures for LOT I (11.5 km long section) were completed in 2013. Construction works will enter into active phase in 2014. Four-lane asphalt-concrete road with a new alignment would be constructed at respective section.

Artificial structures:

Interchange – 2

Bridge – 2

Overpass – 2

Viaduct with length 503.36m – 1 

Construction works were carried out by the company: "JEU Group".

 

Samtredia-Grigoleti Road - Lot II
 

Length of the section to be constructed – 18.5 km.

Were constructed:

  • 9 bridges
  • 3 interchanges
  • 76 rectangle pipes

Construction works were carried out by the company: “Sinohydro”. 

 

Samtredia-Grigoleti Road - Lot III
 

Length of the section to be constructed – 12 km.

Donor – European Investment Bank (EIB)

The construction project of the third lot of Samtredia-Grigoleti envisages construction of four-lane asphalt concrete road, 9 bridge crossings, 2 interchanges and 65 rectangular pipes (overpasses, field and cattle passes).

The third section of Samtredia-Grigoleti road will pass through the city of Lanchkhuti and villages of the Lanchkhuti Municipality.

 

 

Samtredia-Grigoleti Road - Lot IV
 

Length of the section to be constructed – 9.5 km.

Donor – European Investment bank (EIB)

The project envisages the construction of the four-lane asphalt concrete road with the new direction on a 9.5 km section of road.

Were constructed: 

 2 viaducts

  • 1 interchange
  • 42 reinforced concrete underpasses and culverts

Construction works were carried out by the company: „China Railway 23rd”