On March 15-16, the carriageway on the km3-km4 section of the Batumi (Angisa)-Akhaltsikhe road will be temporarily narrowed
On March 15-16, the carriageway on the km3-km4 section of the Batumi (Angisa)-Akhaltsikhe road will be temporarily narrowed
15 March, 2023 14:34:13

Within the framework of the agreement signed with the Roads Department of Georgia, the contractor organization of the department, the joint enterprise POLATYOL & MAPA JV, implements the Batumi bypass road project. within the framework of which, on the km3-km4 section of the Batumi (Angisa)-Akhaltsikhe secondary road, the construction of an alternative pipeline for feeding optical fiber networks and outdoor lighting network is being carried out, for which it is necessary from 15 March 2023 at 22:00 to 06 March 16: until 00:00, on the mentioned section, the roadway will be temporarily narrowed to one, then the other lane and traffic safety measures will be implemented.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: