The Minister of Regional Development and Infrastructure of Georgia inspected a new bridge constructed at the river Korati, in Khobi municipality. Roads Department carried out construction of a new bridge crossing at km 2 of Chaladidi-Khorga-Khobi secondary road.
The existed bridge was in very bad condition and did not meet modern demands for transport.
In order to solve the problem, a new bridge crossing with three pans has been constructed. Junctions with local roads and new road signs were arranged. A length of the bridge is 55 m and a width – 10.95 m.
Due to the construction of a new bridge, traveling to Chaladidi-Khorga-Khobi road became safer and more comfortable.
The project was financed by the state budget and its contractual cost amounted to 1 677 000 GEL. A total of 22 people were employed within the project.