On March 21-22, a temporary traffic diversion will be established in the Gori tunnel
On March 21-22, a temporary traffic diversion will be established in the Gori tunnel
20 March, 2023 15:08:40

In order to carry out preventive works in the Gori road tunnel located on the 88th km of the Tbilisi-Senaki-Leselidze international road, from 23:00 on March 21, 2023 to 02:00 on March 22, 2023, the Senaki-Tbilisi section of the tunnel, and 22 From 02:00 AM to 05:00 AM in March, all types of vehicle traffic is restricted on the Tbilisi-Senaki directions of the tunnel.

During the period of closure of the Senaki-Tbilisi direction of the road tunnel, the traffic flow will be switched to the incoming road of the Gori tunnels of domestic importance.

During the period of closure of the Tbilisi-Senaki direction of the road tunnel, the traffic flow will be diverted to the Senaki-Tbilisi direction of the tunnel, and the Senaki-Tbilisi direction will be diverted to the incoming road of the Gori secondary road tunnels.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: