From 10:00 p.m. on March 12 to 06:00 a.m. on March 13, the carriageway on the km3-km4 section of the Batumi (Angisa)-Akhaltsikhe road will be temporarily narrowed
From 10:00 p.m. on March 12 to 06:00 a.m. on March 13, the carriageway on the km3-km4 section of the Batumi (Angisa)-Akhaltsikhe road will be temporarily narrowed
11 March, 2023 17:23:35

Within the framework of the agreement signed with the Roads Department of Georgia, the contractor organization of the department, the joint enterprise POLATYOL & MAPA JV, implements the Batumi bypass road project. Within the framework of the mentioned project, for the purpose of construction of an alternative power supply pipeline for optical fiber networks and outdoor lighting network on the section of Batumi (Angisa)-Akhaltsikhe secondary road, from 10:00 p.m. on March 12, to 06:00 on March 13, 2023. until 12:00 p.m., on the mentioned section, the carriageway will be temporarily narrowed to one, then the other lane, and traffic safety measures will be implemented.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: