On January 25-26, a temporary traffic switch will be established in the Gori Road Tunnel
On January 25-26, a temporary traffic switch will be established in the Gori Road Tunnel
24 January, 2022 09:09:25

In order to carry out preventive works in the Gori road tunnel located at the 88th kilometer of the Tbilisi-Senaki-Leselidze international road, from 23:00 on January 25, 2022 to 02:00 on January 26, 2022, and 02:00 From 05:00 to 05:00, all types of traffic is restricted on the Tbilisi-Senaki directions of the tunnel.

 During the closure of the Senaki-Tbilisi road tunnel, the flow of vehicles will be diverted to the access road of the Gori secondary road  tunnels.

 During the closure of the Senaki-Tbilisi direction of the road tunnel, the traffic flow will be diverted to the Tbilisi-Senaki direction of the tunnel and the Tbilisi-Senaki direction will be diverted to the access road of the Gori secondary road tunnels.

 The movement will be carried out under the direct supervision and coordination of the patrol police.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: