The River Sulori returned to its natural river-bed and the road rehabilitation works are underway.
The River Sulori returned to its natural river-bed and the road rehabilitation works are underway.
11 July, 2016 00:00:00

Chairman of the Roads Department of Ministry of Regional Development and Infrastructure of Georgia, George Seturidze is currently present on km 12 of Vani-Sulori road and coordinates the disaster relief and road rehabilitation measures on-site.  

As a result of the three-day heavy rain, the Sulori River broke its banks, swept away a main bridge of Sulori village, flooded the residents’ houses and damaged the carriageway of Vani-Sulori connecting road (on km12). Therefore, the transport traffic on the mentioned road section was banned.

By this time, as a result of implemented measures, the River Sulori returned to its natural river-bed and the road rehabilitation works are underway. The transport traffic on the road section of Vani-Sulori will be restored in a few days.

The disaster relief works are being implemented by the Ltd. “State Construction Company”. 

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: