News
On the initiation of administrative proceeding to determine the actual location of the land plots included in the road development zone, included in the N2 and N3 registration blocks, as a result of the change of the 6th tunnel project envisaged by Khevi-Argveta F4 road construction project
21 December, 2021 13:35:41
Order N421 on Initiation of Administrative Proceedings to Determine the Actual Location of the Land Plots in the N2 and N3 Registration Blocks as a Result of the Modification of the 6th Tunnel Project of the Construction of the F4 Section of the Khevi-Argveta Road F4 See command N 421 for...
Agreements have been signed for the construction of the Tbilisi-Sagarejo road
14 December, 2021 11:31:49
The Roads Department of the Ministry of Regional Development and Infrastructure of Georgia continues the development of road infrastructure in the direction of Kakheti. At this stage within the framework of the construction of a new highway in the direction of Kakheti, the construction of the fir...
Construction of a new bridge and access road on the Rioni River in Poti is starting
30 November, 2021 10:41:49
The Roads Department of the Ministry of Regional Development and Infrastructure of Georgia is starting the construction of the Poti Bridge and access roads. In Poti, the planned eight-point steel-reinforced concrete bridge over the Rioni River is 436 meters long, and the length of access ...
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: