Search

July 5, 2009


Chairman of Roads Department of Georgia will monitoring rehabilitation works of 6, 8 km length of secondary Adigeni-Arali-Ude road section (villages Arali and Ude).

Rehabilitation works on the mentioned section includes: construction of road base and paving it with asphalt-concrete (2 layer). Also, arraigning and repairing works of structures, drainage systems, retaining walls, replacing culverts with new ones and repairing of existing structures.  Bridge of reinforce-concrete located on river Qvabliani was rehabilitated.

Also it should be mentioned that during the rehabilitation works, Roads Department of Georgia  has foreseen population ask and made drainage piles and retaining walls. Now, paving process of asphalt-concrete is taking place. Rehabilitation works will be finished in September 2009.

Cost of the works, funded by the state budget is 3 972 000 GEL, rehabilitation works are executed by LTD “Vereli +”.

Rehabilitation of the mentioned works will improve social condition and comfort movement of transport.
 


   
Get Adobe Flash player Get Adobe Flash player