Donor - Japan International Cooperation Agency (JICA)
Project is divided in III sections - III LOTS
LOT I - Kutaisi bypass road – 17.3 km
LOT II - Kutaisi bypass road – Samtredia section - 24.0 km
LOT III – Zestaponi – Kutaisi Bypass Road – 15.2 km
Kutaisi Bypass Road - LOT I |
Length of the section - 17.3 km
Donor – JICA
Following structures are being constructing within the mentioned project:
reinforced-concrete culvert – 32
underpasses – 9
bridges and overpasses – 10
Overpasses:
Nakhshirghele overpass – 73 m
Kutaisi-Baghdadi overpass – 73 m
Kutaisi-Geguti overpass – 73 m
Geguti-Samtredia overpass – 73 m
Railway overpass – 467 m
Bridges:
bridge over the river Nakhshirghele – 105 m
bridge over the river Chishura – 470 m
bridge over the river Tskaltsitela – 107 m
bridge over channel – 36 m
bridge over the river Rioni – 801 m
Kutaisi Bypass Road - Samtredia section -LOT II |
length - 24.0 km
Donor – JICA
Concrete pavement was constructed at 14,8 km section of Kutaisi bypass road – Samtredia section in 2014.
29 underpasses, 24 culverts, 8 overpasses and bridges are constructed within the scope of the project.
Overpasses:
Overpass connecting Geguti-Mukhiani – 41m
Overpass of the Village Bashi – 41m
Overpass of Akhalsopeli –Bashi – 74 m
Overpass No.1 – 74m
Overpass No.2 – 74m
Bridges over the rivers:
Bridge over the river Gubistskali – 338 m
Bridge over the river Cherekha – 41 m
Bridge over the river Ochopa – 106 m
Bridges:
Cholabauri bridge – 105 m
Chkhara bridge – 105 m
Dzevrula bridge – 172 m
bridge No.1 over the stream– 105 m
bridge No.2 over the stream – 105 m
bridge No.3 over the stream– 105 m
Bridge over Charchkheli stream – 105 m
Bridge over Rokiani stream – 105 m
Bridge over Kazhi stream – 105 m
Overpasses:
Terjola Overpass – 74 m
5 pedestrian overpasses – 285 m
Zestaponi-Kutaisi Bypass Road - LOT III |
Length – 15.2 km
Donor – JICA
Project related to construction of a new Zestaponi-Kutaisi Bypass Road considers construction of 15.2 km section with parameters of 4 lane highway. Cement-concrete pavement will be arranged, 9 bridges, 1 overpass and 5 pedestrian overpasses, 28 underpasses and 20 reinforced-concrete culverts would be constructed within the scope of the project.
“TODINI Costruzion Generali SPA” TAKENAKA CIVIL ENGINEERING&CONSTUCTION CO. LTD.