On August 30, traffic in the Gori tunnel will be temporarily restricted
On August 30, traffic in the Gori tunnel will be temporarily restricted
29 August, 2022 14:28:04

In order to carry out preventive works in the Gori road tunnel located on the 88th km of the Tbilisi-Senaki-Leselidze international road, on August 30, 2022, from 00:00 to 03:00 the Senaki-Tbilisi section of the tunnel, and from 03:00 to From 06:00 to 06:00, all types of vehicles are restricted in the Tbilisi-Senak directions of the tunnel.

During the period of closure of the Senaki-Tbilisi direction of the road tunnel, the traffic flow will be diverted to the incoming road of the Gori secondary road tunnels.

During the period of closure of the Tbilisi-Senaki direction of the road tunnel, the traffic flow will be diverted to the Senaki-Tbilisi direction of the tunnel, and the Senaki-Tbilisi direction will be diverted to the incoming road of the Gori secondary road tunnels.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: