On March 30, a temporary traffic switch will be established in the Gori road tunnel
On March 30, a temporary traffic switch will be established in the Gori road tunnel
29 March, 2022 10:18:50

In order to carry out preventive works in the Gori road tunnel located at the 88th kilometer of the Tbilisi-Senaki-Leselidze international road, from March 30, 00:00 to 03:00 on March 30, 2022, and from 03:00 to 06: 00. All types of traffic are restricted on the Tbilisi-Senaki directions of the tunnel until 00:00.

During the closure of the Senaki-Tbilisi road tunnel, the flow of vehicles will be diverted to the access road of the Gori secondary road tunnels.

During the closure of the Tbilisi-Senaki direction of the road tunnel, the traffic flow will be diverted to the Senaki-Tbilisi direction of the tunnel and the Senaki-Tbilisi direction will be diverted to the access road of the Gori secondary road tunnels.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: