Traffic to be restricted in Zestponi near “Ferro rail-track” from 23:00 until 07:00 on 21-24 September
Traffic to be restricted in Zestponi near “Ferro rail-track” from 23:00 until 07:00 on 21-24 September
18 September, 2020 12:10:49

Borani LLC determined 15, 16, 17 and 18 September, 2020 as the time for completion for upgrading damaged asphalt-concrete pavement at km196 of international Tbilisi-Senaki-Leselidze road (near so called “ferro rail-track”), though the works could not be completed within the time limit set due to the high traffic intensity and therefore the road would be reclosed for traffic on 21,22, 23 and 24 September, 2020 from 23:00 until 07:00, but movement will be free during the remaining time of the day.

During the mentioned period, light vehicles shall be diverted to Zestaponi city, while one-way traffic shall be provided for heavy trucks at km196 of international Tbilisi-Senaki-Leselidze road by means of flagmen.

The closed sections of the road will be illuminated at night hours during upgrading works. The company will arrange temporary traffic management signs. Also, required number of the personnel, equipped with the special clothing and flags, will be designated at workplace and closed sections to ensure traffic regulation. 

Mentioned traffic mode will be enforced under direct supervision and coordination of the Patrol Police.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: