Restrictions to be Imposed at Tbilisi-Senaki-Leselidze road on 27-28 February
Restrictions to be Imposed at Tbilisi-Senaki-Leselidze road on 27-28 February
27 February, 2020 08:49:11

According to Roads Department of the Ministry of Regional Development and Infrastructure of Georgia,  from 10:00 a.m. of February 27, 2020 until 20:00 p.m. of February 28, 2020, JSC Georgian Railway plans to rehabilitate rail track, existing under so called protected rail crossing “Teklati”,  which is located at km293 of Tbilisi-Senaki-Leselidze international road (border of Russian Federation), at km5 KP2 of Senaki-Kvaloni railway running line. In addition, it is scheduled to upgrade damaged asphalt-concrete pavement of railway crossing on both sides.

Work performance require closure of the part of the carriageway and temporary shifting of the transport flows into Senaki-Poti(detour)-Sarpi (border of Turkish Republic) international road and Chaladidi-Khorga-Khobi secondary road.

JSC Georgian Railway shall designate appropriately equipped personnel at work and closure locations, who will ensure regulation of traffic flows during execution of works.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: