Construction of the 4th section of Samtredia-Grigoleti road is actively ongoing
Construction of the 4th section of Samtredia-Grigoleti road is actively ongoing
12 December, 2017 00:00:00

Construction of the 4th section of Samtredia-Grigoleti high-speed highway is actively ongoing. The construction project envisages: construction of new directional 4-lane asphalt concrete road on a 9.5 km section, parallel viaduct, interchange, reinforced concrete underpass and culvert.

The 4th section passes through the territory of Lanchkhuti, namely, to the north of the villages of Khazhalia and Akhalsopeli, passes through a certain part of the village of Supsa from the north and connects to Samtredia-Lanchkhuti-Grigoleti road at the end of this village.

At this stage, arrangement works of embankment, culverts and underpasses are actively ongoing.

Samtredia-Grigoleti road is a part of spatial development of the country – one of the important directions of 4-point plan, an initiative of Prime Minister George Kvirikashvili.

Within the spatial arrangement, existing roads, existing sections of high-speed highways and transit corridors passing through Georgia will be in compliance with the modern  standards, new roads will be constructed and a whole network will be formed, as a result of which, necessary primary infrastructure will be equally accessible in all regions.

A donor of Samtredia-Grigoleti road is the European Investment Bank. Cost of construction works is 113 million GEL and up to 370 people are employed.

ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: