Communication was restored to the village Akhaldaba
Communication was restored to the village Akhaldaba
17 June, 2015 00:00:00
​On the Tskneti-Akhaldaba road, 4 the damaged sections from 5 are cleaned and the communication with the first inhabitant of the village was restored. Minister of Regional Development and Infrastructure personally attended the opening of the way.  Currently, works are ongoing to restore the 5th section (which is directly in the village), and if the weather is not deteriorate, before the end of the day, the road will be restored.
Village Akhaldaba has been cut from the world as a result of landslide with volume of million cubic meters, which has occurred during the night of 13-14 of June. To avoid possible flooding 3 drain pipes have been installed, on which the road is arranged. As a result of implemented works it is possible to deliver the fresh water and food to the population of the village Akhaldaba.
​On the Tskneti-Akhaldaba road, 4 the damaged sections from 5 are cleaned and the communication with the first inhabitant of the village was restored. Minister of Regional Development and Infrastructure personally attended the opening of the way.  Currently, works are ongoing to restore the 5th section (which is directly in the village), and if the weather is not deteriorate, before the end of the day, the road will be restored.Village Akhaldaba has been cut from the world as a result of landslide with volume of million cubic meters, which has occurred during the night of 13-14 of June. To avoid possible flooding 3 drain pipes have been installed, on which the road is arranged. As a result of implemented works it is possible to deliver the fresh water and food to the population of the village Akhaldaba.
ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: