Works for liquidation of the results of disaster underway in Devdorak Valley
Works for liquidation of the results of disaster underway in Devdorak Valley
21 August, 2014 00:00:00
The rescuing and cleaning works have been started in Devdorak valley since 4 am. Protective dam was arranged, which stopped the flow of the Terek River on the auto road. Deepening of the river bed of Terek is ongoing.
Mobilizing of the special equipment is continuing.  By this time, several dozen of heavy equipment is working in the disaster zone, during the day the number of the equipment will be increased.
Minister of Regional Development and Infrastructure Davit Shavliashvili, his first deputy George Amashukeli, Chairman of Roads Department, Vazha Panchulidze and other competent persons remain in the disaster zone. The other members of the Cabinet of the Ministers monitor the works on spot.
The exact amount of the loss is being determined.  The state fully funds the works for liquidation of the results of disaster on the place where the landslide occurred.
The rescuing and cleaning works have been started in Devdorak valley since 4 am. Protective dam was arranged, which stopped the flow of the Terek River on the auto road. Deepening of the river bed of Terek is ongoing.Mobilizing of the special equipment is continuing.  By this time, several dozen of heavy equipment is working in the disaster zone, during the day the number of the equipment will be increased.Minister of Regional Development and Infrastructure Davit Shavliashvili, his first deputy George Amashukeli, Chairman of Roads Department, Vazha Panchulidze and other competent persons remain in the disaster zone. The other members of the Cabinet of the Ministers monitor the works on spot.The exact amount of the loss is being determined.  The state fully funds the works for liquidation of the results of disaster on the place where the landslide occurred.
ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: