Works implemented in 2013 by Roads Department of Georgia
Works implemented in 2013 by Roads Department of Georgia
18 March, 2014 00:00:00
Roads Department of Georgia obtains the resources to handle successfully the most ambitious challenges in road sector. As a proof, the statistics of the works implemented within 2013 demonstrate that the figures for all components are considerably higher compared to the previous year. 
Construction activity was progressing at 111 km of road within 2013. Road pavement was constructed on 28,4 km of highway sections by the end of 2013; 15,4 km new road was opened for traffic (traffic was shifted to 12,4 km long section of Kobuleti bypass road (new direction) and 3km long section of Ruisi-Agara road).
Rehabilitation works were implemented on 260 km of road. 45 bridges, 4 tunnels and 1 avalanche protection gallery were capitally repaired.  9 new bridges were built within the scope of rehabilitation projects. 
Based on the Resolution of the Government, 18 additional rehabilitation projects were added to the list of projects to be implemented in 2013. 
 In 2013 riverbank protection activities were carried out at 33 projects.
Access roads to tourist sites and cultural monuments were rehabilitated. Namely, in 2013 rehabilitation works were implemented at access roads to Zarzma Monastery, Jambakur-Orbeliani palace, Kintsvisi monastery. Also Mestia-Ushguli section was rehabilitated. 
18 additional projects were successfully implemented based on Government resolution. However, innovative approach concerning the rational development of the sector and quality of works is considered to be the main achievement. 
Today, construction works are actively progressing at Zestaponi-Kutaisi Bypass Road –Samtredia road. Works are continued at Ruisi-Agara section and Kobuleti Bypass road (LOT II), wherein most part of construction works for bridges, underpasses and culvers are completed. Arrangement of road base is ongoing at respective section and road pavement is being constructed in a concurrent mode.  
Information on construction-rehabilitation works ongoing or implemented by Roads Department is accessible at the official web site of the Department: ww.georoad.ge or you can find at the following link: http://www.georoad.ge/uploads/files/AnnuaReport%20GE%20.pdf 
Construction activity was progressing at 111 km of road within 2013. Road pavement was constructed on 28,4 km of highway sections by the end of 2013; 15,4 km new road was opened for traffic (traffic was shifted to 12,4 km long section of Kobuleti bypass road (new direction) and 3km long section of Ruisi-Agara road).
Rehabilitation works were implemented on 260 km of road. 45 bridges, 4 tunnels and 1 avalanche protection gallery were capitally repaired.  9 new bridges were built within the scope of rehabilitation projects. 
Based on the Resolution of the Government, 18 additional rehabilitation projects were added to the list of projects to be implemented in 2013. 
 In 2013 riverbank protection activities were carried out at 33 projects.
Access roads to tourist sites and cultural monuments were rehabilitated. Namely, in 2013 rehabilitation works were implemented at access roads to Zarzma Monastery, Jambakur-Orbeliani palace, Kintsvisi monastery. Also Mestia-Ushguli section was rehabilitated. 
18 additional projects were successfully implemented based on Government resolution. However, innovative approach concerning the rational development of the sector and quality of works is considered to be the main achievement. 
Today, construction works are actively progressing at Zestaponi-Kutaisi Bypass Road –Samtredia road. Works are continued at Ruisi-Agara section and Kobuleti Bypass road (LOT II), wherein most part of construction works for bridges, underpasses and culvers are completed. Arrangement of road base is ongoing at respective section and road pavement is being constructed in a concurrent mode.  
Information on construction-rehabilitation works ongoing or implemented by Roads Department is accessible at the official web site of the Department: www.georoad.ge or you can find at the following link: http://www.georoad.ge/uploads/files/AnnuaReport%20GE%20.pdf. 
საქართველოს საავტომობილო გზების დეპარტამენტს გააჩნია რესურსები იმისთვის, რომ ქვეყნის საგზაო სექტორში ყველაზე ამბიციურ გამოწვევებს წარმატებით გაართვას თავი. ამის დასტურია 2013 წლის განმავლობაში შესრულებული სამუშაოების სტატისტიკა, რომელიც 2012 წელთან შედარებით ყველა კომპონენტში მნიშვნელოვნად მაღალია.
 
ჩქაროსნულ ავტომაგისტრალზე  2013 წელს სამშენებლო აქტივობა მიმდინარეობდა სულ 111 კმ. გზაზე. 2013 წლის დასასრულისთვის, ჩქაროსნული გზატკეცილის მშენებარე ობიექტებზე საგზაო საფარი 28,4 კმ-ზე მოეწყო, ხოლო ავტოტრანსპორტის მოძრაობის გადართვა სულ  15,4 კმ. ახალაშენებულ გზაზე განხორციელდა (ავტოტრანსპორტის მოძრაობა ქობულეთის შემოვლითი გზის 12,4 კმ-იან ახალი მიმართულების გზაზე და რუისი-აგარის 3 კმ-იან მონაკვეთზე გაიხსნა).
 
საქართველოს საავტომობილო გზების დეპარტამენტის მიერ სარეაბილიტაციო სამუშაოები განხორციელდა 260 კმ  გზაზე. კაპიტალურად შეკეთდა 45 სახიდე გადასასვლელი, 4 გვირაბი და 1 ზვავდამცავი გალერეა. რეაბილიტაციის პროექტების ფარგლებში აშენდა 9 ახალი ხიდი.
 
2013 წლის გეგმის ფარგლებში განსახორციელებული პროექტების ნუსხას მთავრობის განკარგულების საფუძველზე 18 სარეაბილიტაციო ობიექტი დაემატა. 
 
2013 წელს, ნაპირდაცვითი ღონისძიებები ჩატარდა 33 ობიექტზე.
 
რეაბილიტაცია ჩაუტარდა ტურისტულ ობიექტებთან და კულტურული მემკვიდრეობის ძეგლებთან მისასვლელ გზებს. კერძოდ, 2013 წელს სარეაბილიტაციო სამუშაოები განხორციელდა: ზარზმის მონასტერთან, ჯამბაკურ-ორბელიანთა სასახლესთან, ყინწვისის მონასტერთან მისასვლელ გზებზე. ასევე, განხორციელდა მესტია-უშგულის მონაკვეთის რეაბილიტაცია.
 
მთავრობის განკარგულების საფუძველზე, დამატებით, 18 პროექტი წარმატებით განხორციელდა. მთავარ წარმატებად დეპარტამენტი სამუშაოების ხარისხსა და სექტორის რაციონალური განვითარებისათვის განსაზღვრულ ინოვაციურ მიდგომებს მიიჩნევს.
 
დღეისათვის, აქტიურად მიმდინარეობს სამშენებლო სამუშაოები ზესტაფონი-ქუთაისის შემოვლითი-სამტრედიის გზის მონაკვეთზე. გრძელდება სამუშაოები რუისი-აგარისა და ქობულეთის შემოვლითი გზის მეორე ლოტზე, სადაც ხიდების, მიწისქვეშა გასასვლელებისა და წყალგამტარი მილების მშენებლობის სამუშაოების უმეტესი ნაწილი შესრულებულია. აღნიშნულ მონაკვეთებზე გრძელდება გზის საფუძვლის მოწყობისა და პარალელურად, საგზაო საფარის დაგების სამუშაოები.
 
საავტომობილო გზების დეპარტამენტის მიერ განხორციელებული და მიმდინარე სამშენებლო-სარეაბილიტაციო სამუშაოების შესახებ ინფორმაცია ყველასათვის ხელმისაწვდომია დეპარტამენტის ოფიციალურ ვებ-გვერდზე ww.georoad.ge. ან იხილეთ მითითებულ ბმულზე -
 
http://www.georoad.ge/uploads/files/AnnuaReport%20GE%20
ფოტო მასალა
Interactive Map
Georgia 0160, Tbilisi, Kazbegi ave N12,
info@georoad.ge
Hot Line:
(995 32) 2 31 30 76
Join Us: